← All Projects
Chlorination Building
Chlorination / Chemical Dosing Infrastructure

Chlorination Building

Mechanical BIM / Water Treatment

Mechanical BIM modeling and multidisciplinary coordination for a chlorination building serving chemical dosing and disinfection processes. The scope included chlorination equipment arrangement, chemical transfer and injection systems, motive water systems, chemical feed pumps, oxygen generation equipment, air compressor equipment, drainage provisions, access arrangements, and detailed Revit-based coordination and documentation.

Project Type Chlorination / Chemical Dosing Infrastructure
Discipline Mechanical BIM / Water Treatment
Role Lead BIM Modeler / Mechanical BIM Coordinator
Location Confidential
Project Scope

What was delivered

Mechanical BIM Modeling & Coordination of Chlorination Building Systems

Key Design Data

Selected Technical Parameters

ACD Transfer Pump
1 Duty + 1 Standby — 6 m³/hr
Chlorite Transfer Pump
1 Duty + 1 Standby — 10 m³/hr
Air Compressor
1 Duty — 5 m³/hr @ 12.3 bar
Motive Water Pump
2 (1 Duty + 1 Standby) — 13 m³/hr @ 60 m
Chlorine Injection Pump
2 (1 Duty + 1 Standby) — 13 m³/hr @ 65 m
Chlorine Injection Pump
2 (1 Duty + 1 Standby) — 6 m³/hr @ 120 m
Motive Water Pump
2 (1 Duty + 1 Standby) — 6 m³/hr @ 60 m
Motive Water Pump
2 (1 Duty + 1 Standby) — 2 m³/hr @ 60 m
ACD Feed Pump
2 (1 Duty + 1 Standby) — 57 L/hr
Chlorite Feed Pump
2 (1 Duty + 1 Standby) — 58 L/hr
ACD Feed Pump
2 (1 Duty + 1 Standby) — 27 L/hr
Chlorite Feed Pump
2 (1 Duty + 1 Standby) — 27 L/hr
ACD Feed Pump
2 (1 Duty + 1 Standby) — 9 L/hr
Chlorite Feed Pump
2 (1 Duty + 1 Standby) — 9 L/hr
Design & Calculations

Engineering Verification

Mechanical equipment arrangement and BIM coordination for chlorination and chemical dosing systems, including pump duty/standby configurations, flow and head requirements, final pipe-rating verification, equipment access provisions, drainage arrangements, and coordination of chlorination equipment layouts. The model incorporates the equipment arrangement and access requirements defined by the project documentation, with final shop drawings and supplier requirements subject to engineering approval.